|
|
Belt Parkway Bridge Over Ocean Parkway Garden State performed design surveys, including topographical mapping, cross sections and bridge clearances for this $58 million design-build project, one of the first be NYSDOT / NYC DOT. The existing cloverleaf ramps are being closed, replaced with a new diamond interchange with wider ramps. |
|
| back to projects |
|