Routes 1 & 9 over Amtrak at Route 3 Garden State performed horizontal and vertical control surveys, right of way surveys and quantity surveys for this 9.5 million dollar project providing for the replacement of the Route 1&9 structure over Amtrak’s Northeast Corridor line. In addition, the diverge of Route1&9 and Route 3 was reconstructed and an acceleration lane from Route 495 westbound to Route 1&9 southbound was constructed, along with a new ramp from Route 1&9 northbound to Paterson Plank Road Full width shoulders will be constructed along Route 1&9. |
|